| NAICS: 237990 - Other Heavy and Civil Engineering Construction |
Competition: YES |
|
Small Business Set-Aside: N/A
|
Small Business Program: None |
| Contract Vehicle: Design/Build Construction Services II (Regional) (RMACC II) |
Contract Type: Firm Fixed Price |
|
Contract Status:
New Requirement
|
Anticipated Award Quarter: Q2 FY2026 |
| Estimated Solicitation Release: 2026-02-16 |
Contract Complete: 2026-06-16 |
| Requirements Title: 19899285: Repair Emergency Access Road at Sector Columbia River Housing |
| Description: Currently the emergency access road cannot be used for emergency response vehicles and in order to minimize the potential of more significant damage, the City isolated (turned off) the section of water line in the slide area. While this will reduce the risk of the water line breaking and contributing to the slide activity, it does have the downside of reducing flow to the Culp Court neighborhood and eliminates the redundancy that a looped system provides (the looped system was a requirement of the original construction of Culp Court housing. Current water pressure at the highest point of Culp Court was measured at 63 PSI. |
| Estimated Dollar Range:
$1,000,000.00 to $2,000,000.00
|
Place of Performance: Astoria, OR
|
| POC Name: Tony Flores |
Alternate POC Name: |
| POC Phone: (571) 607-1071 |
Alternate POC Phone: |
| POC Email: [email protected] |
Alternate POC Email: |
| Small Business Specialist/APFS Coordinator POC Name: Samantha Watts |
| Small Business Specialist/APFS Coordinator POC Phone: (571) 607-1651 |
Small Business Specialist/APFS Coordinator POC Email: [email protected] |