NAICS: 336611 - Ship Building and Repairing |
Competition: YES |
Small Business Set-Aside: Full
|
Small Business Program: SB |
Contract Vehicle: Indefinite Delivery Contract |
Contract Type: Firm Fixed Price |
Contract Status:
New Requirement
|
Anticipated Award Quarter: Q4 FY2025 |
Estimated Solicitation Release: 2025-06-02 |
Contract Complete: 2030-08-31 |
Requirements Title: Special Purpose Craft - Boarding Team Delivery II & Law Enforcement Boat Maintenance Contract |
Description: U. S. Coast Guard Maritime Security Response Teams (MSRT) utilize 11 Meter (11M) Special Purpose Craft – Boarding Team Delivery II (SPC-BTD II) and 33’Special Purpose Craft – Law Enforcement (SPC-LE) boats as part of the operational resources. The SPC-BTD II and SPC-LEs require periodic maintenance as well as design upgrades to improve performance and extend usable life of the boats and associated equipment.
The objective of this requirement is to establish a multiple award firm fixed price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract for repair, maintenance, and upgrade services for the SPC-BTD II and SPC-LE.2.1 The objective of this requirement is to establish a multiple award firm fixed price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract for repair, maintenance, and upgrade services for the SPC-BTD II and SPC-LE.
The Contractor shall provide the personnel, management, materials, equipment, and facilities (unless otherwise provided by the Government as stated in the Task Order) necessary to perform any required repair, maintenance, and upgrade services for the fleet of SPC-BTD II and SPC-LEs located in the San Diego, California and Chesapeake, VA localities. The scope includes pre-defined Work Packages as outlined in this Statement of Work (SOW), in addition to Over-and-Above Work Requests (OAWR) for physical installation of Engineering Change Proposals (ECPs), Non-Engineering Change Proposals (NECPs), and other emergent repairs or necessary upgrades to the SPC-BTD II and SPC-LE and their associated systems and equipment. All specific requirements for repairs, maintenance, upgrades, ECPs and NECPs shall be addressed in each Task Order. The Contractor is solely responsible for its work techniques and control and supervision of Contractor personnel in performance of the contract. The Contractor shall actively retain all appointments, licenses, certifications, and permits required to perform work under this contract and provide any evidence of such to the Government upon request. The Contractor shall comply with all applicable Federal, State, and Local laws regarding the use, handling, or disposal of hazardous materials required under the contract. Hazardous materials may include, but are not limited to, petroleum products, paints, and coatings. |
Estimated Dollar Range:
$2,000,000.00 to $5,000,000.00
|
Place of Performance: Chesapeake, VA and San Diego CA, NA
|
POC Name: Dan Murray |
Alternate POC Name: Kurtis Mees |
POC Phone: (571) 608-2950 |
Alternate POC Phone: (206) 815-1031 |
POC Email: [email protected] |
Alternate POC Email: [email protected] |
Small Business Specialist/APFS Coordinator POC Name: |
Small Business Specialist/APFS Coordinator POC Phone: |
Small Business Specialist/APFS Coordinator POC Email: |